Saturday, September 7, 2013

Interior trim and backsplash



 I have drywall dust in my lungs and joint compound in my veins.  The east wall almost looks like a paintable surface after several rounds.

Andy has been working on the trim and it is almost done, pending one more trip to the "real" lumberyard.




And the backsplash project is underway.


No comments:

Post a Comment